8 Lincoln Street, North Easton, Ma

Unit 209 

7\8\21

Click to enlarge/scroll

1/26

Work done/Assessment:

Exterior masonry re-pointing/patch and silicone to address leaking issue on sill in unit 209

Exterior Masonry, Roof patch and door access

7\15\21

Click to enlarge/scroll

1/59

Work done/Assessment:

Tenants said leaking had lessened from previous repair. Additional upper re-pointing on brick throughout area above and beside window (209)
-Attic door repair. Avalanche of debris found holding door closed and inaccessible. Removed lockset, plane door 3/16" so it closes properly. Replaced new lockset. Address leak in rotunda, upper level. Many rubber roof tears found and repaired. 

Unit 02

Click to enlarge/scroll

1/34

View/Print Procedural Report

6\24\21

View/Print certificate of sanitization